Castle Ablutions are fully fitted, factory-built toilet and shower facilities designed for rapid installation on prepared foundations or footings. Each unit leaves our Henderson factory complete and tested.
This BPIR covers every ablution product customised from the Castle Ablutions product line.
Castle Ablutions are designed and manufactured to contribute to compliance with the following clauses of the New Zealand Building Code.
Supporting documentation is available on request – contact our team.
Steel frame engineered to AS/NZS 4600; Bondor panels designed to AS/NZS 1170 loads.
Materials selected to meet the minimum 15 / 50 year durability requirements.
Bondor panel joint system with sealants installed in accordance with E2/AS1.
Non-toxic construction. No asbestos.
Fully compliant sanitary fixture layout.
Pipework and fixtures comply with G12/AS1.
Waste connections comply with G13/AS1.
Simple, repeatable steps that keep every Castle Ablutions unit weathertight, compliant and in service for years.
This building product / product line is not subject to a warning or ban under section 26 of the Building Act.